The End-of-Month (EoM) module plays a critical role in ensuring that Asset Hire is accurate, transparent and efficient. Since Asset Hires form the foundation of revenue tracking, it is vital that all hire processes are captured, processed and invoiced.
Note: You will require the "Edit EOM" User permissions.
Begin by navigating to "ASSET HIRE" from the dropdown menu, and select "End of Month"
A summary of EoM rows that have been completed for the date range is in the top left.
The toolbar is located at the top right.
End of month rows sit underneath these.
Tip: Any rows highlighted in blue, outline the rows that have been automatically updated and calculated with any known SMU entries.
For instructions on how to run End of Month, read the below article
For instructions on how to push End of Month rows to Xero, read the below article
For instructions on how to link with Xero, read the below article
For instructions on how to link Xero Tracking, read the below article
For instructions on how to create cost codes, read the below article




