An Asset can be allocated to a Project upon Asset creation, this is outlined as the final step in the below article.
An Asset can also be allocated at a later date, to do this please follow the instructions below.
Navigate to the Asset register by selecting "ASSETS" in the menu.
Search for the Asset you are wanting to allocate to a Project in the "+ Search Tags" field or find it in the listed assets.
Next, select the Asset(s) you wish to assign to a Project by clicking the dashed circle, located on the left of the Asset.
Select the "ASSIGN TO PROJECTS" button located at the top of the page.
Once Asset(s) have been chosen, the below popup will appear.
If you are wanting to reassign an Asset to an entirely different Project, change the first drop down to "Overwrite Projects"
If you are wanting to add an Asset to another Project, whilst keeping it assigned to the current Project, leave the first dropdown as "Add Projects"
On the second dropdown, select the Project(s) you wish to assign the Asset(s) to.
To submit, select the tick on the bottom right hand corner of the pop-up. A prompt will appear to confirm you want to continue, select "YES".
Any User with permission to that particular Project will now be able to view the Asset.
Users in the VIPER Operator app will need to Update their Data to see the changes.